Counters and sinks removed.
After Day 1
The wall and door which crowds Ted's sink will be dry walled and the door moved around the corner.
Tub gone and the right hand wall will become the entry to the commode room.
Shower things removed.
The shower footprint will be enlarged. It will be tiled, have a decorative band and a niche for bottles decorated same as the band, pebble look floor and frameless glass. Plumber due for Day 2.
No comments:
Post a Comment